Saudi Aramco-Juymah NGL Abdullah Al Dossary Co
- Soil Development and Site Preparation for Tank Farm Construction
- Excavation and Backfilling
- Boundary Fence
- Access Road and Demolition of Existing Pond and Building
Location
Juymah NGL Plant Eastern Pro
Date
Feb 2020 to 2022 Dec
Completion
100%
Amount
34M
INOCHEM SODA ASH & CALCIUM CHLORIDE PLANT-China Chengda Engineering-CRITICAL ENGINEERING- CO.
- Storage Steel Tank Erection
- Fabrication and Welding
- Installation of Handrail
- Installation of StairCase
- Installation of Nozzles and Manhole
Location
Ras Al Khair Jubail
Date
Jan 2022 Oct - 2022
Completion
100%
Amount
3M
CONTINETAL TRADING AND CONTRACTING CO LTD
- Washout Work for MGS-2 Pipe Lline Aramco
- Installation of RipRap Mattress Inclusive of Stone with wiremesh
- Installation of Concrete Works with Wiremesh
- Installation of Cabion with Galvanize Steel Boxes
Location
Ad Dawadmi
Date
2020 - 2021
Completion
100%
Amount
13M
SAUDI INVESTMENT RECYLING CO. (SIRC & CDW)
- Site Preparation and Earth Work
- Fencing and Gates
- Tank Foundation
- Building Foundation and Structure Works
- Electrical Duct Bank and Electrical Manhole
- Drainage System and Storm Water Manholes
- Road Asphalt Works
Location
Riyadh North Al Khair Project
Date
2020 May to July 2021
Completion
100%
Amount
13M
MAADEN - TDP CO. NEW HEAP LEACH CONSTRUCTION
- New Heap Leach Site Preparation
- Earth Work Cutting and Leveling
- Berm Construction and Shaping
- HDPE Pipe and Liner Installation
- Crushing and Gravel Matting
Location
As Suq Gold Mine
Date
2020 June to Dec 2020 (6 Mmonths)
Completion
100%
Amount
5M
GEMS WAST CHEMICAL TREATMENT PLANT JUBAIL
- Construction of Infrastructure of Recycling Plant
- Storage Tanks – 36 Nos
- Pipe Track Installation
- Pipe Networks – Steel and PVC, uPVC
- Fire Fighting Pipe Lines and Pump Installation
- Fire Hydrant Installation and Valve Installation
- Flowmeter and Fire Alarm Installation
- Tank Foundation
- Structural Building Erection and Cladding Installation
- Building Finishing Works
- Electrical Duct Bank and Manholes
- Underground Networks (Drainage, Sewage, Storm Line)
- Boundary Fence and Gate Installation
- Evaporation Pond Construction and HDPE Liner Installation
- Earth Works and Soil Improvement
Location
Jubail
Date
2017 - 2020
Completion
100%
Amount
26M
GEMS WAST CHEMICAL TREATMENT PLANT DAMMAM
- CONSTRUCTION OF INFRASTRUCTURE OF RECYLING PLANT
- Rehabilitation of Pipes networks
- Installation of Valves and Fittings
- Installation of Fire Fighting Tank Nozzles
- Installation of Fire fighting Distribution
- Plant Springler System
- Flowmeter and Fire Alarm Installation
- DIWMC - Concentrated Acid Holding Tanks 2 TK-03050 Constructed
- DIWMC - OWS System Piping Works
- DIWMC- OWS- Process Water Line and Process Air line, Removal of Existing overflow line
- DIWMC - MBR Tank Strengthning Supports
- DIWMC - FRT Piping Network
- DIWMC - RRT Staircase Fabrication & Installation
- HOMA - Steel Structure Storage Building-1&2 Fabrication & Erection
Date
2018-2019
Location
Dammam
Date
2018 - 2019
Completion
100%
Amount
30M
GEMS WAST CHEMICAL TREATMENT PLANT JOHFA
- IWMC MDAS System Concrete Slab Foundation
- IWMC MDAS System Concrete Slab Foundation
- IWMC MDAS Sluge mixing pad modification
- IWMC Piping and Equipment Installation
Location
Johfa / Rabigh
Date
2018 - 2019
Completion
100%
Amount
0.7M
National Environmental Preservation Company (BeeAh)
- Landfill Construction, Embankment and Ramp
- Excavation and Backfilling
- Access Road and Building Asphalt Works
- HDPE Liner Installation
- Security Fence and Gate Installation
Location
Johfa / Rabigh
Date
2018 - 2019
Completion
100%
Amount
3.8M
GEMS WAST CHEMICAL TREATMENT PLANT YANBU
- Site Preparation and Fencing Work
- Earth Work (Berm Construction and Land Filling)
- Tank Foundation
- Pipe Structural Fabrication and Erection
- Sand Blasting and Painting of Tanks
- Dyke Wall
- Boundary Wall Construction
Location
Yanbu Al-Shinaya RC
Date
2017 - 2018
Completion
100%
Amount
3.7M
Location
Riyadh
Date
2023 - 2025
Completion
98%
Amount
12M
Location
Riyadh
Date
2023 - 2025
Completion
98%
Amount
12M